Phase 1 Construction:

 

The primary goal for the Funding Cycle I and Phase I Construction was to begin to capture building square footage that was being underutilized and convert to functional academic areas. 

 

The secondary goal was to make improvements to the Academic spaces and specifically Science areas that were both very old and severely deficient in number of spaces. 

 

The third goal was to accomplish some site reconfigurations to clearly state where the front entry of the facility is located, provide better vehicle access, to provide additional parent drop-off, and to provide more visitors parking at the main entries.

 

The fourth goal was to continue to update the Renewal Master Plan to include any new information and design that is accomplished during the Phase I design work.

 

 

Phase 2 – Construction:

 

The primary goal for the Phase 2 Construction was to provide the space that will eventually be the Academic Area 2 classrooms to replace the non-compliant courtyard space which will be demolished in Phase 6.  The secondary use of the Phase 2 area will be as a temporary library until the Performing Arts / Music area is completed and the permanent library can be cstructed in the final location.

 

The secondary goal was to accomplish some site reconfigurations that were deferred in Phase 1 to clearly state where the front entry of the facility is located, provide better vehicle access, to provide additional parent drop-off, and to provide more visitor parking at the main entries.

 

The third goal was to continue to update the Renewal Master Plan to include any new information and design that is accomplished during the Phase 2 design work.

 

 

Phase 3 – Construction:

 

The primary goal for the Phase 3 Construction was to provide the new Performing Arts and Music Core spaces in the center of the facility.  This includes new 700 Seat Auditorium, Orchestra, Band, Chorus rooms and support spaces such as Drama Room, and Technology lab.  Additionally, the Phase 3 work includes the L-Shaped area to the north of the core area to include a new Home Economics room, Live Skills, Physics, Chemistry and the Deaf and Hard of Hearing program areas.  Further, due to the demolition of the Guidance spaces to complete the Performing Arts core, and the fact that the Four Academic areas are not yet complete, a renovation of four classrooms in the Benson Building was provided to accommodate Guidance in the interim time until all Academic Areas are completed in Phase 6 allowing for guidance to be decentralized to the Academic Areas.

 

The secondary goal was to accomplish some site reconfigurations for the new North Student Parking, entry plaza, and new north Entry.  Additionally the New South Drop-off area is to be completed. that were deferred in Phase 1 to clearly state where the front entry of the facility is located, provide better vehicle access, to provide additional parent drop-off, and to provide more visitor parking at the main entries.

 

The third goal was to continue to update the Renewal Master Plan to include any new information and design that is accomplished during the Phase 3 design work.

 

 

Phase 4A – Construction:

 

The primary goal for the Phase 4A Construction was to renovate the old Music Suite into the New and Final Library/IMC area.  This will finally put the Library at the front to the building, centrally located, and easy for evening access.   In addition,

 

The secondary goal was to then renovate the Area 2, the Temporary Library into six Classrooms.  The area immediately north will be renovated into the New Extended Learning Center and staff support space.  This will provide 8 of the 13 classrooms for the South Academic Area.  There will be no Sitework in Phase 4A. 

 

The third goal was to continue to update the Renewal Master Plan to include any new information and design that is accomplished during the Phase 4A design work.  This includes some altering of the order of the SW, NE and SE Academic Areas to complete the worse areas first, which is SW Academic Area.  This is shown in phase plans for 4B, 5, and 6.